Products Search
Products Categories
Company News
- 10-29Major brands in the color steel plate industry staged cross-border "dramas"
- 10-29The four major strategies will constitute the key factors for the modern color steel plate industry
- 10-29Grasping the trend of consumer upgrading: color steel plate enterprises understand consumer thinking
- 10-29What is the development direction of color steel plate enterprises in the era of "quality consu
- 10-29New trends in the color steel plate market:Industry reshuffle intensifies
Shandong colored steel coil, PVC coil
Detailed introduction
Scope of use | Architectural decoration | material quality | colour steel |
---|---|---|---|
purpose | building | Type | composite material |
Characteristics | Strong weather resistance and bright color |
PVC rolls are generally produced using the rolling method. Among them, there are fewer fillers and more plasticizers than PVC floor tiles. Generally, PVC plasticized by a four roll rolling mill is used. After rolling, the surface is flat and smooth, and after cooling, it is cut and rolled to produce the product. The specifications of the coil materials vary from country to country, and the soft PVC coil flooring material is relatively soft, with a certain degree of elasticity and comfortable foot feel.
Construction requirements
Before paving the floor, the concrete floor must be leveled with mortar C10 15 to 20 days in advance, with a leveling height 5mm lower than the designed height of the ground. The leveling surface is smooth.
2. The flatness requirement for the leveling of the basic ground with coiled material flooring is that the height error within every 2 meters is less than 2 millimeters.
3. The concrete and leveling layer must be fully dried before installing the roll flooring, which usually takes 15-20 days to construct. The moisture content of the entire ground shall not exceed 5%.
4. The leveling layer must have sufficient bearing capacity and be free from cracks, hollowing, and sand formation. The strength of the base cement must be greater than 10Mpa.
5. The foundation ground should be clean and free of grease, paint, glue, cement blocks, etc.
6. After the installation of the floor, the foundation line should be constructed, and attention should be paid to protecting the installed coiled material floor during construction.
7. Where the coiled floor is connected to other floors, other floors must be installed first and the edges must be properly treated to ensure smooth connection.